|
Business Opportunities -
Advantages of the Port
|
|
Advantages of the Port
Draft and areas of navigation
Links to major economic and industrial zones of the country and the East Coast of the United States through 11 multimodal corridors established. (rail) and a modern highway.
Navigation channels
|
Navigation channels
|
Actual Length
|
Width between ParametERS of Berth
|
Template WIDTH )
|
DEPTH
|
Location
|
Maximum Beam
|
| Canal Comercial |
1,322
|
300
|
100
|
16.50
|
4
|
50
|
| Canal Norte |
2,360
|
300
|
100
|
16.50
|
6
|
50
|
| Canal Oriente |
1,621
|
300
|
100
|
14.00
|
7
|
50
|
| Canal Suroeste |
1,100
|
300
|
100
|
14.00
|
3
|
50
|
| Canal Noroeste |
756
|
224
|
100
|
8
|
8
|
50
|
| TOTAL |
8,899
|
|
|
|
|
|
|
|
| |
 |
|
|
|
Última actualización el Miércoles, 07 de Abril de 2010 17:18 |
|
|
Business Opportunities -
Business Projects
|
|
Business Projects
|
DISMANTLING SHIP TERMINAL
|
|
Area:
|
20 h.
|
|
Quay:
|
540 m .
|
|
Start operations:
|
December 2008
|
|
Investment:
|
5,800,00 USD
|
|
Use:
|
Public
|
|
BULK MINERAL TERMINAL
|
|
Area:
|
22 h.
|
|
Quay:
|
650 m.
|
|
Start operations:
|
October 2009
|
|
Investment:
|
29,039,000 USD
|
|
Use:
|
Public.
|
|
CONTAINER TERMINAL I
|
|
Area:
|
122 h.
|
|
Area 1st. Phase:
|
48.33 h
|
|
Total berths:
|
4
|
|
Berths 1st. phase:
|
2
|
|
Capacity for receiving vessels:
|
140,000 tons of displacement capacity
|
|
Annual throughput
|
2 million TEUS
|
|
Total Investment:
|
400 million USD
|
|
Use:
|
Public
|
|
PROJECT OF THE CONTAINER TERMINAL II
|
|
Area:
|
102 h
|
|
Quay:
|
1425 m.
|
|
Berths:
|
4
|
|
Throughput:
|
2 million TEU / year
|
|
Start tender:
|
December 2008 / January 2009
|
|
Start Operations:
|
November 2010 (estimated)
|
|
Investment
|
400 million USD. (estimated)
|
|
Use:
|
Public
|
|
|
Última actualización el Miércoles, 07 de Abril de 2010 17:07 |
|
|
|
|
|
|